
Gottwald Crane Project for MDC Terminal
From February to June 2018, IPC delivered two Gottwald second hand mobile cranes to the MDC Multipurpose Terminal, both in excellent working condition and complete with warranty.
This supply enabled the terminal management to sign the concession and open the MDC terminal in less than 40 days.